MUKIYA / IN PROGRESS — Building in the open
BUILD CYCLE · JUN 2026 · 4 PRODUCTS TRACKED

Watch us
build it.

Every Mukiya product — from first sketch to the shelf — is tracked in public. One honest update a month. No vapor, no countdown theater. When a timeline moves, you hear it here first, with the reason.

FIG.01 — T822-G / 3-IN-1 STATION REV. C

/ 01 — The Roadmap

Five stages. Every product sits in exactly one. Hover over a node to see what it means.

01

IP / Concept

Industrial design locked. It exists in CAD and on paper.

02

First Sample

First physical unit off the line. We hold it, stress it, shoot it.

03

Sample Refinement

Tuning materials, tolerances, output. The unglamorous part.

04

To Overseas Warehouse

Mass-produced and shipped to US / EU fulfillment.

05

Live

On sale. Waitlist and r/Mukiya get first access.

ALL · 4 IP / CONCEPT FIRST SAMPLE REFINEMENT WAREHOUSE LIVE
ADJUSTING
3-in-1 Magnetic Charging Station
T822-G

3-in-1 Magnetic Charging Station

MagSafe + watch + buds, with a soft ambient light.
IP
SAMPLE
REFINEMENT
WAREHOUSE
LIVE
JUN '26

Original May target moved to July. Sample units 6–10 in hand; refining the light diffuser and the stand angle before we freeze it.

ON TRACK
Mac Mini Dock HUB
HUB-M162

Mac Mini Dock HUB

Slots under the Mac Mini · RGB underglow · front-facing ports.
IP
SAMPLE
REFINEMENT
WAREHOUSE
LIVE
JUN '26

First sample delivered. Shooting product renders this month — RGB tuning looks right on the prototype.

ON TRACK
Folding Rotating Laptop Stand + HUB
HUB-M163

Folding Rotating Laptop Stand + HUB

Lift, rotate and dock all in one unit; our core flagship project guiding brand roadmap.
IP
SAMPLE
REFINEMENT
WAREHOUSE
LIVE
JUN '26

First samples landing end of June. This is the one that defines where the line is headed — we'll over-document it.

DELAYED
25,000mAh Magnetic Power Bank
BP0001A

25,000mAh Magnetic Power Bank

MagSafe pack built for all-day, airline-friendly capacity.
IP
SAMPLE
REFINEMENT
WAREHOUSE
LIVE
JUN '26

Production pushed from August to September. We're locking a cell supplier we trust over one that's cheaper — not negotiable on a battery.

No products at this stage this cycle.

/ 02 — Build Log

The monthly diary. The same notes our team works off — wins, slips, and why.

JUN 2026// CURRENT CYCLE
  • T822-G May → July. Samples 6–10 in hand; diffuser + stand angle in refinement.
  • HUB-M162 / M163 First samples in. Render shoot underway; RGB and rotation feel right.
  • BP0001A Production moved Aug → Sep — switching to a cell supplier we trust.
  • Community Waitlist + r/Mukiya are open. First "what next" poll is live below.
MAY 2026
  • HUB-M162 / M163 Designs locked; first samples ordered.
  • BP0001A Cleared refinement; moved into production planning.
  • Direction Locked the line's look: white, graphite, steel-blue accent — one warm light per device. No rainbow RGB on the chargers.
/ 03 — Why we build in the open

Most hardware brands show you a render and a launch date, then go quiet for nine months. That's where trust goes to die.

Mukiya posts one honest update a month — concept, sample, the parts that go wrong, the dates that move. You see the same board our engineers do.

The deal is simple: when a timeline slips, you hear it here first, with the reason. Specs get copied in a quarter. Letting you watch how we decide is the part nobody can clone.

/ 03 — Build it with us

You're not an audience. Early backers shape what we sample next.

Vote: what should we sample next?

Top pick goes onto the board next cycle. One vote per visitor — or add your own idea.
150W Travel Charger — GaN, 4-port0%
Transparent 100W Power Bank0%
Mac Mini Dock — Steel vs Graphite finish0%
› TAP AN OPTION TO VOTE, OR WRITE YOUR OWN
Live discussion, sample feedback and teardown shots live on r/Mukiya. Join →

Get the launch ping

One email a month — the same Build Log you see here, plus first access and backer pricing when a product goes live. No spam, unsubscribe anytime.
Currently shipping to
US · UK · DE · FR · NL · CA · AU
more regions added as warehouses come online